Meter Base Replacement
$1,200–$2,500
- New 200A meter base
- Service entrance connections
- Permit and inspection
- All utility coordination
When the panel is already 200A but the meter base needs replacement
MO License #20250016884.9 Star Average. 410+ Reviews.Cottleville, MO Office
Much of Chesterfield was built from the 1970s through the 2000s, so many homes have 150- or 200-amp service that now has to carry EV chargers, finished basements, pools and larger HVAC systems.
Pick what you're noticing. We'll tell you what it usually means, how urgent it is, and what fixes it.
One flickering fixture is often a bulb or a loose connection. Lights that dim across the house when something starts up point to a service or panel that is near its limit.
Common causes
Your panel can only use the power your service delivers. We upgrade the whole service entrance, from the weatherhead and mast to the meter base and main disconnect, to 200 or 400 amps, and coordinate the disconnect and reconnect with your utility. We serve all of Chesterfield, from Chesterfield Mall to the neighborhoods toward Town and Country.
An estimate, not a quote. Estimates for installs and upgrades are free; your exact flat price comes after we see the job, and it's the price you pay.
$1,200–$2,500
When the panel is already 200A but the meter base needs replacement
$2,500–$4,500 plus $1,200–$2,500 for the meter base
The most common upgrade from 100-amp service
$8,000–$15,000
Large homes with all-electric systems, shops, pools
Typical job: 1 day (most homes).
We inspect your meter base, mast, service conductors, panel and grounding, then calculate your load, including anything you plan to add, so the new service is sized right the first time.
You get an itemized quote: meter base, conductors, mast or weatherhead work, panel work if needed, permit and utility coordination.
We pull the permit and schedule the disconnect and reconnect with your utility, Ameren Missouri or, in parts of St. Charles County, Cuivre River Electric Cooperative.
With the power off, we replace the service entrance equipment and terminate it at the panel. Most services are completed in one day.
After the inspection passes, the utility sets the meter and restores power. We test every circuit before we leave.
Reviews that mention this work first.
4.9 Star Average. 410+ Reviews. Google, Facebook, BBB and Angi.
Fully licensed and insured in Missouri:MO State License #2025001688,St. Charles County #E25-000008,St. Louis County #ES4501.Lifetime workmanship warranty on installed work.
See everything about electrical service upgrades, or all our electrical services in Chesterfield.
Yes. We pull the permit with the office that has jurisdiction at your address, St. Louis County or the City of Chesterfield, and schedule the inspection. The permit is included in our quote.
Chesterfield is served by Ameren Missouri. When the work needs the power disconnected or a meter changed, we coordinate it with the utility for you.
All of Chesterfield (63005, 63017) and the surrounding area, including Town and Country, Ballwin, Wildwood, Creve Coeur.
The panel distributes power to your circuits. The service is everything that brings power to the panel: the weatherhead, mast, service entrance conductors and meter base. Going from 100 to 200 amps usually means upgrading both.
Often, yes. A 100-amp meter base can't support 200-amp service. If yours is undersized, damaged or doesn't meet current utility requirements, replacement is part of the quote.
Yes. The utility provides and installs the meter after we complete the meter base upgrade and pass inspection.
Yes, for large homes with high demand: all-electric systems, multiple EV chargers, pools, workshops. We confirm with your utility that 400A supply is available at your address.
Most service upgrades are completed in one day. Power is off while the equipment is replaced and until the inspection passes and the utility reconnects.
Yes. Mast and weatherhead damage is the homeowner's side of the connection. We repair or replace it, get it inspected, and coordinate the reconnect with the utility.
Free on-site estimate, and a flat price before any work begins.
Most estimates booked within 1-3 business days.